This is the last demolition downstairs. The bathroom framing has started and should be ready next week for the plumbers.
Still more work on the floors as there was a lot of adhesive left from the linoleum. There were three layers of flooring to remove.
1 comment:
yay I am glad it is getting close! Cant wait to see beautiful fabric in there!
Post a Comment