There's only one change that's needed to pass the rough-in inspection. I have to change the footers of the interior walls to treated wood. The inspector checked to see if there could be an exception, but there is not. Anywhere a wall touches concrete has to be treated. That won't take too long. Here are pictures of electrical and plumbing. Maybe a week to change the footers and then we can get started on the finish work like drywall. And the inspector gave me an option to painting the i-beams with a special 1 hour fire rated paint, so we don't have to enclose them. Kathy will be thrilled!