He cut concrete to drop the sewer line down into it so the bathroom can be on main floor and not up where the kitchen was, so we won't have to build a ramp. And he pour some concrete to stabilize the wall. I'm very thankful that he knows what he is doing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment